What is a CT (current transformer) chamber?
A CT chamber is a wall-mounted cabinet with a hinged front door. The electrical power being metered flows through the CTs, which are fitted inside it.
The CTs provide the current (amps) to the meter, which is mounted on the front of the chamber. The chamber also provides the voltage to the meter. An electricity meter measures power, which is the product of current and voltage.
Power (watts) = volts × amps
Why do I need a CT chamber?
A CT chamber is needed to install a CT meter.
Why do I need a CT meter?
A standard whole current meter can only handle up to 100 A (69 kVA), so it is limited to smaller electrical demands. A CT meter is needed for any load over 100 A.
A CT meter is rated at only 5 A. The 400/5 CTs in our chamber reduce the current being metered by a factor of 80 (400 ÷ 5), so the current to the meter never exceeds 5 A. The meter is programmed to match: when it detects 3 A, it knows the actual current is 3 × 80, which is 240 A.
Where does the CT chamber need to be installed?
The chamber and meter need to be accessible to the end user and the meter installer. Mount the chamber at a height where the meter can be read or installed without steps.
The electrical contractor is responsible for making sure the cables into and out of the chamber match the load being metered, so the chamber must sit at a point in the distribution system where all of the power being metered passes through it.
CT chambers can be installed remotely, for example in a central plant or metering room, or within the premises being metered.
Why do I need to tell you the power flow direction?
Power can flow through the chamber in only two ways: bottom to top, or top to bottom. The CTs must be fitted to match. If they are fitted the wrong way round, the meter will not work.
What if the power flow direction changes after delivery?
The CTs will need to be turned over, or the connections on each CT can be swapped instead. We will advise on the right fix.
What if the cabling will not fit inside the chamber?
This happens occasionally, depending on the cable specification. We can supply extension boxes for the top, the bottom or both. These add to the overall space needed and to the cost.
What if my load is greater than 400 A?
The same principle of using CTs applies. Larger CT chambers exist, but not on a pre-wired, delivery-only basis. They need to be designed into the electrical installation as early as possible and installed on site, and in most cases a separate metering panel is needed close by to hold the meter. We can advise on these installations.
I have several loads or premises over 100 A. What do I need?
Each load or premises needs its own CT meter, and so its own CT chamber. Commercial developments often have several.
How do I arrange for a CT meter to be installed?
The CT meter cannot be installed until the CT chamber is in place.
The meter is installed by the end user’s appointed Meter Operator, on instruction from their electricity supplier. So the end user needs to appoint an electricity supplier and a Meter Operator, and for that they need the MPAN (Meter Point Administration Number). This 13-digit number is allocated to each metering point, and whoever arranged the new electrical connection should give it to the end user.
We can advise and help with the metering process if needed.