The CT Chamber Company

The pre-wired CT chamber, ready for the meter.

Our CT chambers are dispatched fully meter ready, with the CTs fitted, wired and certificated. You mount it on the wall and connect the cables; the meter operator has everything in place to fit the meter first time.

Rated
400 A
Loads up to
280 kVA
CT ratio
400/5
Class
0.5S

Fully meter ready

Your only job is to mount the chamber on the wall and run the incoming and outgoing cables.

  1. No CTs to buy

    A current transformer on each phase, fitted before dispatch.

  2. Certificates included

    CT accuracy certificates come with the chamber, printed and as a PDF.

  3. No extra wiring

    The CTs are wired through to the meter position in our workshop.

  4. Meter fitted first time

    The meter operator has everything in place to fit the meter, first time, every time.

The standard specification

Current rating400 A (loads up to 280 kVA)
Standard CT ratio400/5
CT rating5 VA
Accuracy class0.5S
CertificationCT accuracy certificates included

Full specification

A pre-wired CT chamber open, with current transformers and terminal block fitted

From the team behind CT Metering Services

The CT Chamber Company was founded by the team behind CT Metering Services, serving the UK electricity supply industry since 1980. Our chambers are built to make meter installation faster, safer, and fully compliant.

About us

When you need a CT chamber

Loads over 100 A

A standard whole current meter cannot meter more than 100 A, so a CT meter is needed, and a CT chamber for it. The chamber must be in place before the meter operator attends.

Typical sites

Retail and commercial units, larger landlord supplies in apartment blocks, and factory units.

Over 400 A?

We can advise on other CT metering options. Read the FAQs or ask us.

Need a chamber for a CT metering point?

Tell us about the job, including the power flow direction, and we will come back with a quote. We reply within 24 hours.